Northeast Gateway: Welaunee Boulevard Project Development & Environment Study

  • Blueprint, in coordination with the City of Tallahassee and Leon County is conducting a Project Development and Environment (PD&E) study for Phase 1 of the Northeast Gateway: Welaunee Boulevard project. This is the next phase in the development of a new Northeast Gateway, building on the numerous planning and engineering efforts that have preceded this study in the Welaunee area.
  • The objective of this PD&E study is to evaluate Phase 1 of the Northeast Gateway. Phase 1 is an extension of four-lane Welaunee Boulevard from Fleischmann Road over I-10 and north to connect at an intersection with a two-lane extension of Shamrock Street South, east of Centerville Road.
  • Phase 2, which is not a part of this study and unfunded at this time, will evaluate the continuation of a four-lane Welaunee Boulevard from the Shamrock Street Extension north to connect to Roberts Road as well as extending the Shamrock Street Extension across Miccosukee Road to provide connection to Mahan Drive.

For complete project information, please visit:

https://negateway.com/

Gateway District: Southwest Access Plan

Gateway District: Southwest Access Plan

Pedestrian Bridge Picture

Pedestrian Trail and Bridge Capital Cascades Crossing and Trail Segment 3

Gateway District: Southwest Access Plan

Magnolia Drive Multi-Use Trail

Capital Circle Project

Capital Circle

 

Capital Cascade Trail Picture

Northeast Gateway

Capital Cascades Crossing Trail and Bridge

Capital Cascades Crossing Trail and Bridge

Orange/Meridian Placemaking

Orange/Meridian Placemaking

City of Tallahassee Logo Leon County Logo