All Projects

Widening of Capital Circle NW from I-10 to Blountstown Highway – (six lanes from I-10 to Tennessee Street, four lanes from Tennessee Street to Blountstown Hwy. and two interchanges); water resource protection through greenway linkages and flood plain acquisition; and protection of Gum Swamp system
Widening of Capital Circle SE from Crawfordville Hwy to St. Augustine Road – partial acquisition of Tram Road ROW for future transit; acquisition of environmentally sensitive areas, and greenway connection between St. Marks Trail and Southwood
Franklin Boulevard, Cascades Park, Old St. Augustine Branch reconstruction – Reconstruction of Franklin Blvd. and stormwater improvements; greenways and trail development; acquisition of stormwater right of way along St. Augustine Branch and Central Drainage ditch.
Water Quality Program Funding-Phase I -(includes $10M for Frenchtown watershed drainage improvements and $5 M for County retrofit projects)
Eastern Leon County groundwater and floodplain protection-Phase I – (420 acres approved for purchase via FCT grant, 25% local share of $540,000 to be advance funded by County per action by IA 7/9/01 and County 7/10/01)
Lafayette Basin floodplain/greenway land acquisition – for future stormwater improvements and greenway connection from Lafayette Heritage Trail to Miccosukee greenway
Widening of Capital Circle SW from Blountstown Hwy. to Springhill Road – Right of way acquisition and road construction; land acquisition for future greenway.
Widening of Capital Circle SW from Springhill Road to Crawfordville Road – Right of way acquisition and road construction; land acquisition for future greenway.
Land acquisitions -for greenway linkages between Maclay Gardens, Timberlane Ravine, Goose Pond, and Tom Brown Park
Old St. Augustine Branch stormwater improvements -Gamble Street to confluence with Munson Slough: Segment Four (Note: Construction of Segment Four of the Capital Cascade Trail was moved to Tier One on September 19, 2005 by action of the Intergovernmental Agency.)
Widening of Mahan Drive from Dempsey Mayo Road to I-10 – Stormwater improvements for roadway and Lake Lafayette; trail development (Note: The widening of Mahan Drive was moved to Tier One on June 4, 2007 by action of the Intergovernmental Agency.)
Fred George and Ochlocknee River Basins – Stormwater improvements, groundwater protection, and greenway acquisition (Note: Acquisition of several properties in the Fred George Basin were moved to Tier One on June 4, 2007 by action of the Intergovernmental Agency.)
Gaines Street Reconstruction/Jackson Bluff Road extension –  (IA approved on 7/9 the design of Jackson Bluff Road extension to be repaid from Blueprint 2000 funds)
Airport Gateway-Connectorfrom Capital Circle SW to Lake Bradford Road
Eastern Leon County groundwater and floodplain protection-Phase II
Meridian Road intersection improvements and greenway connections Timberlane Ravine to Klapp-Phipps-Overstreet Park
Water quality program funding-Phase II
Lake Lafayette Basinstormwater improvements and floodplain protection
Springhill Road ROW and constructionstormwater system and improvements from Springhill Road east to Indianhead Acres; greenways/trail development
Black Swamp restoration – regional stormwater pond, and Cascades to Munson Slough greenway trail development
Tram Road ROW and constructioninterchange at Crawfordville Road
Roadway improvements connecting Capital Circle SW and Springhill Roadinterchange at Orange Ave. and Capital Circle SW
Service RoadsCapital Circle NW
Gaines Street Reconstruction
Elinor Klapp Phipps Soccer Complex Improvements
Jack L. McLean, Jr. Park Recreation Center and Pool
Lafayette Heritage Trail Facilities
A. J. Henry Park Recreation Center and Pool
Ox Bottom Neighborhood Park Development
Unidentified Major Intersection Improvements
Tallahassee Junction Bikeway Trail Head Development
Urban Corridor Project-Lake Bradford Road Gateway Enhancement
Bronough and Duval Street Corridor Enhancements (Tennessee to Tharpe)
Governor’s Park Facility and Park Enhancements
 Springsax Sports Complex Enhancements
Greenway Connector Trails
Urban Corridor Project–North Monroe Street Gateway Enhancement
Calhoun/Gadsden/Thomasville Road Operation Study Improvements
Four Points Bikeway Trail Head Development
Urban Corridor Project–Tennessee Street Gateway Enhancement
Urban Corridor Project–South Adams Street Gateway Enhancement
Magnolia/Lafayette Street Improvements
Total projects to be funded with 10% of sales tax revenues
Greenway Connector Trails
Urban Corridor Project-Pensacola Street Gateway
Alford Arm Regional Greenway Park
Total projects 20-22
Greenways, Parks and Recreation
Jackson View Park, Woodville Community Park, Woodville Community Center, Alford Arm, Northeast Community Park, Miccosukee Community Center, Miccosukee Greenways, Lake Jackson Community Center, St. Mark’s Headwaters Park and Apalachee Regional Park
Sewer System Projects
Centerville Trace Sewer Project, Harbinwood Sewer Project and Woodville Sewer Project
Stormwater Projects
Killearn Acres Flood Mitigation
Lafayette Street reconstruction
Gadsden Street reconstruction (Gaines to McDaniel)
Upper St. Marks Wetland preservation
Longwood Subdivision retrofit
Munson Slough improvements
 Autumn Woods Way culvert improvement
Transportation Projects
Gaines Street reconstruction project
Meridian/Franklin (Franklin/Lafayette to Gaines)
Lafayette Street reconstruction
Old St. Augustine Road reconstruction (Blair Stone to Capital Circle)
Chaires Cross Road (US 27 north to the RR crossing)
Intersection Improvements
Talpeco Road @ US 27 North
Crowder Road @ US 27 Northimprovements
Tram Road @ Gaile Avenue
Bridges, Sidewalks, Bike Lanes, Bike Paths
Bridges
Sidewalks
Bike Lanes
Bike Paths
Total projects to be funded with 10% of sales tax revenues
Bike Paths
Stormwater Projects
Harriett Drive reconstruction
Meridian Road
Crump Road Wetland construction
Jack Vause Road stabilization
Jefferson Road bridge
Miccosukee Road wetland construction
Baum Road (North) elevation
Moccasin Gap Road elevation
Buck Lake Road/Chaires Crossroads storage ponds
Buck Lake Road
Old Bainbridge at Homewood
State Road 59 elevation and pond construction
Benjamin Chaires Road elevation
Baum Road (South) elevation
Transportation Projects
Old St. Augustine Road (Capital Circle to Southwood Plantation)
Miccosukee Road (Capital Circle to Edenfield)
Miccosukee Road @ Capital Circle/Capital Medical Drive
Miccosukee Road @ Fleishmann Road
Buck Lake Road @ Chaires Cross Road
Miccosukee Road @ Medical Blvd
Tharpe Street @ Colorado Street
Gadsden Street @ Pensacola Street
Tharpe Street @ Maryellen Street
Tharpe Street @ Trimble Street
Franklin Boulevard Project

Franklin Boulevard

 

MagnoliaDrive-BoardMap-1-Overall-Board-H

Magnolia Drive Multi-Use Trail

Capital Circle Project

Capital Circle

 
Capital Cascades Crossing Trail and Bridge

Capital Cascades Crossing Trail and Bridge

 
Famu Way Project

FAMU Way

 